Alarm N6 Series Spécifications Page 20

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 85
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 19
Unpacking
/
Setting Up
6.7
Mounting onto bath bridges
The bath bridges will be delivered unassembled
by means of transportation.
rn
!
Switch off the unit and pull out the mains plug.
Loosen the
2
crosshead screws right beside the
pump connections.
Slide the metal jacket to the front (slightly bending
may be necessary) and remove it.
Place the gasket around the opening and slide
the control head inclined through the opening.
!
Lift the float to avoid any damage.
Fix
the jacket again with the
2
crosshead screws.
Vue de la page 19
1 2 ... 15 16 17 18 19 20 21 22 23 24 25 ... 84 85

Commentaires sur ces manuels

Pas de commentaire